
Services
Groundworks
Everything below ground that a good build depends on: excavation, foundations, drainage, soakaways and concrete slabs, done properly and signed off by building control.
The part of the build you never see
Groundworks are the first thing we do on almost every extension, and the one stage you can't put right later. If the foundations are too shallow, the drainage falls the wrong way or a soakaway is undersized, the problems show up years afterwards as cracks, damp or flooding. We take our time below ground so the rest of the build goes up straight, level and dry.
We carry out groundworks as part of our extensions and garden projects, and as stand-alone work for homeowners, designers and other trades who need a reliable groundworks team.
Groundworks we carry out
- Site clearance and excavation
- Muck-away and waste removal
- Strip and trench-fill foundations
- Pad foundations for steel columns
- Blockwork up to damp-proof course
- New below-ground drainage runs
- Inspection chambers and connections
- Soakaways and attenuation crates
- Concrete slabs, oversites and screeds
- Retaining walls and level changes

Foundations
Most extension foundations in South East London are trench-fill or strip foundations dug into firm ground. London clay shrinks and swells with the seasons, and trees nearby can draw moisture out of it, so foundations near trees or on clay often need to go deeper. The structural engineer and building control decide the final depth, and building control inspects the excavation before any concrete goes in. Steel columns for knock-throughs and goalpost frames sit on their own pad foundations, sized by the engineer.
Drainage and sewers
We lay new below-ground drainage in the right pipe, at the right fall, with inspection chambers where you need access, and connect it to the existing system. If you're building over or within 3 metres of a public sewer, you'll usually need the water company's agreement first: Thames Water across most of South East London, and Southern Water in parts of Kent. We check the sewer records early, so there are no surprises once the ground is open.
Soakaways and surface water
New roofs and patios create extra rainwater that has to go somewhere. Where it can't go into the existing drains, we install soakaways or modular attenuation crates wrapped in geotextile membrane. On larger jobs, building control may ask for a percolation test to show the ground drains well enough. We build these to the agreed design rather than guessing.
Common questions
How deep do extension foundations need to be?
It depends on the soil, nearby trees and the load. On firm ground a typical depth is around 1 metre, but clay soils and trees can push that deeper. Building control and your engineer set the final depth on site, and we dig to that.
Do you take away the soil?
Yes. Muck-away is included in our groundworks quotes. We plan grab lorries or skips around access and parking, and keep the road and pavement clean.
Can you do groundworks only, for another builder?
Yes. Get in touch with the drawings and the engineer's details and we'll price the groundworks package on its own.
What if you find something unexpected?
Old drains, buried foundations and soft spots do turn up. We stop, show you, agree the fix with building control and the engineer, and price any change before we carry on.
Free, no-obligation quote
Tell us about your project
Send us a few details and we'll call you back to arrange a site visit. If you have drawings, we can price from them. If you don't, we can point you to designers we work with.
020 3576 3546- Itemised quotes, not one lump sum
- Unlimited revisions while you finalise the scope
- We'll match a like-for-like quote
- Warranty on all our work
